Customization: | Available |
---|---|
Certification: | CE, GMP, ISO |
Condition: | New |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Item/Model | LPG | |||||||
5 | 25 | 50 | 100 | 150 | 200-2000 | |||
Inlet Temperature (ºC) | ≤ 350 | |||||||
Outlet Temperature (ºC) | 80 to 90 | |||||||
Maximum Moisture Evaporation (kg/h)* | 5 | 25 | 50 | 100 | 150 | 200-2000 | ||
Drive type of Centrifugal Spray Nozzle | Compressed air drive | Mechanical drive | ||||||
Rotating Speed | 25000 | 22000 | 21500 | 18000 | 18000 | 15000 | ||
Diameter of Spray Disk (mm) | 50 | 102 | 108 | 108 | 150 | 180-340 | ||
Heat Source | Electricity | Electricity | Electricity+ steam, fuel oil, gas | Electricity+ steam | Electricity+ steam, fuel oil, gas | Depending on users | ||
Maximum Power of Electric Heating (kw) | 8 | 31.5 | 60 | 81 | 99 | |||
Overall Dimensions (L × W × H) | 1.8 × 0.93 × 2.2 | 3 × 2.7 × 4.26 | 3.7 × 3.2 × 5.1 | 4.6 × 4.2 × 6 | 5.5 × 4.5 × 7 | According to the actual situation | ||
Dry Powder Recovery (%) | ≥ 95 | ≥ 95 | ≥ 95 | ≥ 95 | ≥ 95 | ≥ 95 |
Pre-service
Act as a good adviser and assistant of clients to enable them get rich and generous returns on their investments.
1. Introduce the product to the customer in detail, answer the question raised by customer carefully;
2.Make plans for choice according to the needs and special requirements of users in different sectors;
Sale service
1. Ensure product with high quality and pre-commissioning before delivery;
2. Delivery on time;
3.Provide full set of documents meet customer`s requirements.
After-sale service
Provide considerate services to minimize clients` worries.
1.Assist clients to prepare for the first construction scheme;
2.Install and debug the equipment;
3.Train the first-line operators;
4. Examine the equipment;
5.Take initiative to eliminate the troubles rapidly;
6.Provide technical support;
7.Establish long-term and friendly relationship.
Service commitment
1. Provide clients one-year warranty to make sure the machine work well;
2.We always keep certain inventory level of spare parts, which means the replacements can be sent to you timely;
Principle of work matters that should be known before order:
1. What is Particle liquid name and materials property, solid contents or water contents, viscosity, surface tension and PH value.
2. Powder material contents after the drying, permissible residual water contents, particle size, and permissible maxing temperature.
3. Energy that can be supplied: steam pressure supply capacity, electricity capacity, fuel coal, oil and air capacity?
4. Control requirement: how many celcius the inlet air temperature need to be controlled?
5. Powder collection requirement: whether or not the bag type collector should be mounted and what is the requirement of the environment for discharging the exhausted gas?
6. Other special requirements.